The Engineering Building follows the same principles as other structures on the Baekyang Campus, minimizing alterations to the natural topography, conforming to the terrain, and reflecting the existing campus axis. As the first building encountered upon entering the Phase 2 campus, it also functions as a gateway, which should be addressed through an additional concept in terms of physical circulation and visual presence.
The project site featured a steep slope with a 20m elevation difference, but through iterative drawings and repeated site visits, two building plots were created within the master plan scope with minimal terrain modification: the lower plot responsive to the existing campus flow and the upper plot for the main mass announcing the new campus threshold, physically and visually connected through this plan.
In the Press








-
Status
Completed
-
Awards
- 2003 Busan Architecture Award_ Silver Award
-
Client
Parkyoung Academy
-
Program
Education
-
Design Year
2000
-
Completion Year
2002
-
Location
Sasang-gu, Busan
-
Site area
870,966.00m2
-
Gross Floor Area
97,791.00m2
-
Building Area
29,211.91m2
-
Number of Levels
B1, 10F
The Engineering Building follows the same principles as other structures on the Baekyang Campus, minimizing alterations to the natural topography, conforming to the terrain, and reflecting the existing campus axis. As the first building encountered upon entering the Phase 2 campus, it also functions as a gateway, which should be addressed through an additional concept in terms of physical circulation and visual presence.
The project site featured a steep slope with a 20m elevation difference, but through iterative drawings and repeated site visits, two building plots were created within the master plan scope with minimal terrain modification: the lower plot responsive to the existing campus flow and the upper plot for the main mass announcing the new campus threshold, physically and visually connected through this plan.
In the Press