Plant 6, located within Songdo’s Second Bio Campus, is a crucial project for the client to bridge the gap between demand and supply for biopharmaceuticals and achieve sustainable growth in the bio industry. The Plant 6 construction project includes a main factory with a biomanufacturing capacity (CAPA) of 180,000 liters and a large-scale office space of approximately 9,600 pyeong (about 31,500 m²) accommodating around 2,700 employees. Various auxiliary buildings with distinct purposes, such as an Open Innovation Center, amenity facilities, and a parking building, are planned in a rational layout. Building on the know-how accumulated at the First Bio Campus, the goal is to optimize operations and set a new standard for biopharmaceutical production.
In The Press



-
Status
Completed
-
Client
S Biologics
-
Program
Industrial, Manufacturing
-
Design Year
2024
-
Completion Year
2027(planned)
-
Location
Yeonsu-gu, Incheon
-
Site area
357,365.30m2
-
Gross Floor Area
189,615.24m2
-
Building Area
46,895.95m2
-
Number of Levels
5F
-
Design
Smart Office BU + Design SU + Big-Tech BU
-
Participants
Plant 6, located within Songdo’s Second Bio Campus, is a crucial project for the client to bridge the gap between demand and supply for biopharmaceuticals and achieve sustainable growth in the bio industry. The Plant 6 construction project includes a main factory with a biomanufacturing capacity (CAPA) of 180,000 liters and a large-scale office space of approximately 9,600 pyeong (about 31,500 m²) accommodating around 2,700 employees. Various auxiliary buildings with distinct purposes, such as an Open Innovation Center, amenity facilities, and a parking building, are planned in a rational layout. Building on the know-how accumulated at the First Bio Campus, the goal is to optimize operations and set a new standard for biopharmaceutical production.
In The Press


