Design

The best professionals who have gained plenty of experiences and know-hows
through various projects are the source of Junglim’s competitiveness to provide the highest-quality service.

Junglim’s BIM

Providing efficient and sustainable space by predicting outcomes in advance

Establishing a building information modeling (BIM) design team called “Junglim Integrated Design” in 2003, we have focused on leading the integrated process of project planning, delivery, and research/development, as well as on staff training and technical development. We are embodying the BIM-based cutting-edge design techniques to predict the outcomes in advance and provide environment-friendly, energy-efficient, and sustainable space.

No. 1 BIM performance record in Korea as Introduce Diagram : 1.TOP in BIM - Along with various experiences of performing BIM projects, we are recognized with the top BIM technology in Korea. No. 1 BIM project performance record in Korea from 2011 to 2017(Total 78 BIM projects performed as of Dec. 1, 2017), 2.Junglim Architecture Contributes to Society with BIM -2016: Junglim Architecture concludes an MOU with Autodesk, - 2016: Distributes free copies of Autodesk BIM Guidebook, Template, and Library, 3.Junglim’s BIM and IT teams develops structural drawing automation - 2014: Registers a patent No. 10-1472324 - “Automatic System and Method for Generating Structural Drawings” - The Drawn.S program automates structural drawing with the in-house Excel list of calculating structural members.
BIM Design Phase 4 Diagram : 1.Design Development : Designing by reflecting the client’s needs accurately - Integrated review of schematic design, - Setting alternatives, - Starting to build up a library, : Designing rationally through three-dimensional visualization, - Developing data, - Confirming the final design, - Updating the library 2. Construction Documents : Reducing errors with interference check and elevating values with performance analysis - Completing the final design drawings and documents, - Inputting the information on construction progress and breakdown, - Interference check 3. Construction : Reducing construction risks with pre-simulation - BIM-based on-site construction management, - Supporting construction drawing and reviewing construction progress, - Supporting maintenance
BIM Program Design Image
Back to Top