The Samyang Corporation Cheonan Distribution Center is a project to build a new CDC (Central Distribution Center) for Samyang Corporation, linking and integrating 11 nationwide bases. The first floor is planned as a low-temperature logistics center for frozen and refrigerated cold chain food materials, while the second floor is designed as an ambient temperature logistics center with a live load capacity of 3 to 5 tons per square meter.
To ensure efficient logistics flow while securing additional expansion space, vehicle entrances and exits for each floor were separately installed by utilizing approximately a 9-meter level difference on the site. The two floors are staggered in section, creating a pilotis space on the first floor. A double slab was installed beneath the low-temperature logistics center to overcome temperature conditions around 20°C. Support facilities are designed with reinforced concrete structure, the first floor uses precast concrete structure, and the second floor is planned with a standard steel structure, matching the functions of each area.
-
Status
Completed
-
Client
삼양사
-
Program
Industrial
-
Design Year
2016
-
Completion Year
2019
-
Location
충청남도 천안시 동남구
-
Site area
27,127.40m2
-
Gross Floor Area
19,333.28m2
-
Building Area
11,472.78m2
-
Number of Levels
지상 2층
-
Design
-
Participants
박성형, 김연진, 전윤철, 정새롬








The Samyang Corporation Cheonan Distribution Center is a project to build a new CDC (Central Distribution Center) for Samyang Corporation, linking and integrating 11 nationwide bases. The first floor is planned as a low-temperature logistics center for frozen and refrigerated cold chain food materials, while the second floor is designed as an ambient temperature logistics center with a live load capacity of 3 to 5 tons per square meter.
To ensure efficient logistics flow while securing additional expansion space, vehicle entrances and exits for each floor were separately installed by utilizing approximately a 9-meter level difference on the site. The two floors are staggered in section, creating a pilotis space on the first floor. A double slab was installed beneath the low-temperature logistics center to overcome temperature conditions around 20°C. Support facilities are designed with reinforced concrete structure, the first floor uses precast concrete structure, and the second floor is planned with a standard steel structure, matching the functions of each area.