IPARK Avenue, Wirye

IPARK Avenue, Wirye

Wirye New Town was developed with the concepts of a high-tech eco-city, a rich historic and cultural city, and a symbiotic city where people coexist. The C1-3 block site, where the I-Park Wirye Phase 1 will be built, is the first sold complex among the four Transit Mall blocks in the new town’s central commercial area. Leveraging its position at the junction of residential and central commercial zones, the development focuses on revitalizing the local community and optimizing the residential environment. From the site layout stage, emphasis was placed on eco-friendly residential design considering south-facing orientation, ventilation, and views; activation of the commercial environment through alignment with the Transit Mall; and diverse external space planning considering surrounding connections.

The façade design implements varied design systems on protruding balconies located on the front, rear, and sides. From a landscape planning perspective, varied building heights and forms — from symbolic 7-story buildings to slab-type 19 to 24-story towers — were used to create an urban landscape harmonizing with neighboring complexes. Sunken plazas, rooftop gardens, and other gathering spaces were planned for public enjoyment, and a pocket park on the north side is also connected to public walkways, providing a green resting place. Neighborhood facilities were planned in street-type, terrace-type, and standalone styles, each optimized for the respective space, and appropriate vehicular and pedestrian circulations were arranged for residential and commercial areas.

기사

  • Status

    Completed

  • Awards
    • 2016 제25회 한국건축문화대상 준공부문 우수상
  • Client

    ㈜하나자산신탁

  • Program

    Residential

  • Design Year

    2012

  • Completion Year

    2015

  • Location

    서울특별시 송파구

  • Site area

    21,044.00m2

  • Gross Floor Area

    98,602.06m2

  • Building Area

    8,465.29m2

  • Number of Levels

    지하 3층, 지상 7~24층

  • Participants

    김영훈, 우지성, 홍성현, 곽용성, 김세형, 김영훈, 김유나, 김효남, 문성현, 백의현, 송옥자

Wirye New Town was developed with the concepts of a high-tech eco-city, a rich historic and cultural city, and a symbiotic city where people coexist. The C1-3 block site, where the I-Park Wirye Phase 1 will be built, is the first sold complex among the four Transit Mall blocks in the new town’s central commercial area. Leveraging its position at the junction of residential and central commercial zones, the development focuses on revitalizing the local community and optimizing the residential environment. From the site layout stage, emphasis was placed on eco-friendly residential design considering south-facing orientation, ventilation, and views; activation of the commercial environment through alignment with the Transit Mall; and diverse external space planning considering surrounding connections.

The façade design implements varied design systems on protruding balconies located on the front, rear, and sides. From a landscape planning perspective, varied building heights and forms — from symbolic 7-story buildings to slab-type 19 to 24-story towers — were used to create an urban landscape harmonizing with neighboring complexes. Sunken plazas, rooftop gardens, and other gathering spaces were planned for public enjoyment, and a pocket park on the north side is also connected to public walkways, providing a green resting place. Neighborhood facilities were planned in street-type, terrace-type, and standalone styles, each optimized for the respective space, and appropriate vehicular and pedestrian circulations were arranged for residential and commercial areas.

기사

Films

Related Projects