







The Coupang Fulfillment Center 2, located within the Phase 3 General Industrial Complex in Pyeongdong, Gwangsan-gu, Gwangju, is the first high-tech fulfillment center (FC) in the Honam region. Built on a 15,000-pyeong (around 50 thousand sq. m.) site with a total floor area of approximately 50,000 pyeong (around 165 thousand sq. m.), the warehouse facility was designed to operate as a nationwide FC, providing comprehensive services of storage, sorting, packaging, and delivery.
The design concept emphasizes expansion and stability in logistics operations. The warehouse façades expose the concrete construction to highlight functionality, while the supporting facilities feature simpler façades with urethane panels, symbolically expressing each facility’s character. This approach also reflects a practical design that considers cost efficiency and enhanced facility security.
To ensure smooth FC operations, a circulation dock system was adopted to maximize loading dock capacity and improve efficiency of both vehicle and user circulations. This project represents Coupang’s first case of integrating its in-house security process from the design stage, expected to serve as a new standard for future Coupang fulfillment centers. Reflecting the facility’s large scale, the main common hall was placed along the workers’ circulation route in connection to welfare facilities and a rooftop garden, forming an integrated rest space.
기사
-
Status
Completed
-
Client
쿠팡㈜
-
Program
Industrial
-
Design Year
2020
-
Completion Year
2024
-
Location
광주광역시 광산구
-
Site area
48,747.19m2
-
Gross Floor Area
168,180.49m2
-
Building Area
37,915.38m2
-
Number of Levels
지상 9층(창고동), 지상 5층(지원동)
-
Design
-
Participants
박성형, 김연진, 김충본, 김태겸, 김한수, 박길선, 송진하








The Coupang Fulfillment Center 2, located within the Phase 3 General Industrial Complex in Pyeongdong, Gwangsan-gu, Gwangju, is the first high-tech fulfillment center (FC) in the Honam region. Built on a 15,000-pyeong (around 50 thousand sq. m.) site with a total floor area of approximately 50,000 pyeong (around 165 thousand sq. m.), the warehouse facility was designed to operate as a nationwide FC, providing comprehensive services of storage, sorting, packaging, and delivery.
The design concept emphasizes expansion and stability in logistics operations. The warehouse façades expose the concrete construction to highlight functionality, while the supporting facilities feature simpler façades with urethane panels, symbolically expressing each facility’s character. This approach also reflects a practical design that considers cost efficiency and enhanced facility security.
To ensure smooth FC operations, a circulation dock system was adopted to maximize loading dock capacity and improve efficiency of both vehicle and user circulations. This project represents Coupang’s first case of integrating its in-house security process from the design stage, expected to serve as a new standard for future Coupang fulfillment centers. Reflecting the facility’s large scale, the main common hall was placed along the workers’ circulation route in connection to welfare facilities and a rooftop garden, forming an integrated rest space.