Hyundai Samho Heavy Industries Headquarters

Hyundai Samho Heavy Industries Headquarters

The design competition for the Hyundai Samho Heavy Industries headquarters began under conditions that differed from other projects.
First, as the first headquarters building for a Hyundai Group affiliate, it had to embody a sense of symbolism; second, it was a design competition requiring the submission of two proposals; and third, we had to design a 10,000-pyeong office building that maximized the use of the corner of a triangular site.
We presented two proposals: one that drew on the traditional heritage of Hyundai Group headquarters, and another that harmonized with the triangular site and the shipyard of Hyundai Samho Heavy Industries. Ultimately, the latter proposal was selected and led to the building’s completion.

  • Status

    Completed

  • Client

    HD HYUNDAI SAMHO CO., LTD.

  • Program

    Office

  • Design Year

    2011

  • Completion Year

    2015

  • Location

    Yeongam-gun, Jeollanam-do

  • Site area

    183393.20m2

  • Gross Floor Area

    107876.59m2

  • Building Area

    59870.17m2

  • Number of Levels

    B1, 11F

The design competition for the Hyundai Samho Heavy Industries headquarters began under conditions that differed from other projects.
First, as the first headquarters building for a Hyundai Group affiliate, it had to embody a sense of symbolism; second, it was a design competition requiring the submission of two proposals; and third, we had to design a 10,000-pyeong office building that maximized the use of the corner of a triangular site.
We presented two proposals: one that drew on the traditional heritage of Hyundai Group headquarters, and another that harmonized with the triangular site and the shipyard of Hyundai Samho Heavy Industries. Ultimately, the latter proposal was selected and led to the building’s completion.