We accepted this project based on the successful performance of the Mando Mexico project. At the first attempt when Mando had to create a production complex with two subcontractors, it was a big challenge to meet different requirements of each company and to perform proper separation and connection of the flow of distribution. We eventually found the solution for separation and connection of each company through a clear deployment and flow plans. Also, taking into account the considerations of harmony, we found the solution for façade designs of several buildings. As Mando Poland planted the first flag of Junglim in Europe, we also expect a successful completion of this project in Latin America.



-
Status
Completed
-
Client
MANDO Corporation
-
Program
Industrial
-
Design Year
2015
-
Completion Year
2016
-
Location
Saltillo, Mexico
-
Site area
105,557.00m2
-
Gross Floor Area
44,292.04m2
-
Building Area
43,467.87m2
-
Number of Levels
B1, 2F
We accepted this project based on the successful performance of the Mando Mexico project. At the first attempt when Mando had to create a production complex with two subcontractors, it was a big challenge to meet different requirements of each company and to perform proper separation and connection of the flow of distribution. We eventually found the solution for separation and connection of each company through a clear deployment and flow plans. Also, taking into account the considerations of harmony, we found the solution for façade designs of several buildings. As Mando Poland planted the first flag of Junglim in Europe, we also expect a successful completion of this project in Latin America.


