The Nonghyup Chemical Warehouse facility was moved to integrate Nonghyup chemical factory and warehouse facilities scattered in Dae-jeon City and An-san City into Iksan City, and the project was started to cope with future agriculture. The Nonghyup Chemical affiliated warehouse facility to be newly built this time will be erected first, and a plant with a later production function will be built and the entire master plan will be established. A steel frame (PEB) structure considering economical efficiency was selected, and the structure type outer cover was covered with a panel to constitute a gable type mass. Because the goods were vulnerable to water during the loading and unloading of the warehouse, the roof panel system was protruded 12m and we wanted to make the building identity through the canopy.In addition, the standard that meets the logistics flow and function of storage warehouse is presented, Considering the connection with the second stage plant facility to be enlarged in the future.







-
Status
Completed
-
Client
Nonghyup Chemical
-
Program
Industrial
-
Design Year
2018
-
Completion Year
2019
-
Location
Iksan-si, Jeollabuk-do
-
Site area
40,944.20m2
-
Gross Floor Area
21,903.61m2
-
Building Area
21,903.61m2
-
Number of Levels
1F
-
Design
-
Participants
The Nonghyup Chemical Warehouse facility was moved to integrate Nonghyup chemical factory and warehouse facilities scattered in Dae-jeon City and An-san City into Iksan City, and the project was started to cope with future agriculture. The Nonghyup Chemical affiliated warehouse facility to be newly built this time will be erected first, and a plant with a later production function will be built and the entire master plan will be established. A steel frame (PEB) structure considering economical efficiency was selected, and the structure type outer cover was covered with a panel to constitute a gable type mass. Because the goods were vulnerable to water during the loading and unloading of the warehouse, the roof panel system was protruded 12m and we wanted to make the building identity through the canopy.In addition, the standard that meets the logistics flow and function of storage warehouse is presented, Considering the connection with the second stage plant facility to be enlarged in the future.