Jincheon National Traning Center Phase 2

Jincheon National Traning Center Phase 2

At the 2012 London Olympics, the national team athletes achieved outstanding results. The public rejoiced at their selection and passion, cheering them on with one heart. In this way, sports bring great inspiration and drama to the people. The Jincheon National Training Center, which serves as the home base for national team athletes striving for success, required more than just a simple building; it demanded careful consideration of long-term needs.

  • Status

    Completed

  • Client

    Korean Sport & Olympic Committee

  • Program

    Sports

  • Design Year

    2012

  • Location

    Jincheon-gun, Chungcheongbuk-do

  • Site area

    594,711.00m2

  • Gross Floor Area

    110,766.00m2

  • Building Area

    57,144.97m2

  • Number of Levels

    B1, 15F

At the 2012 London Olympics, the national team athletes achieved outstanding results. The public rejoiced at their selection and passion, cheering them on with one heart. In this way, sports bring great inspiration and drama to the people. The Jincheon National Training Center, which serves as the home base for national team athletes striving for success, required more than just a simple building; it demanded careful consideration of long-term needs.

Films