SK Hynix Cheong-ju Semiconductor Fab

SK Hynix Cheong-ju Semiconductor Fab

The Cheongju Technopolis General Industrial Complex is a newly developed site located near the Seocheongju Interchange. Designed to accommodate the expansion of the existing industrial complex, this site was established on the northern side to support the industrial ecosystem of Cheongju. With its excellent views and convenient transportation, many companies are moving in and reborn with their own unique identities. Spanning 60,000 square meters—eight times the size of a soccer field—with a length of 339 meters and a width of 172 meters, and a height of 71 meters. The Cheongju Hynix M15 Project, housed in a majestic two-story cleanroom that embodies Hynix’s vision for the Fourth Industrial Revolution, will involve a phased investment of approximately 20 trillion won. This project is designed to proactively address future demand and serve as a forward base to lead the semiconductor market in the years to come.

  • Status

    Completed

  • Order

    SK Eco Plant Co., Ltd.

  • Purpose

    Industrial, Logistics

  • Design Year

    2017

  • Location

    Eumseong-gun, Chungcheongbuk-do

  • Site area

    53,250.00m2

  • Gross Floor Area

    29,810.20m2

  • Building Area

    9,653.46m2

  • Scale

    B1, 3F

The Cheongju Technopolis General Industrial Complex is a newly developed site located near the Seocheongju Interchange. Designed to accommodate the expansion of the existing industrial complex, this site was established on the northern side to support the industrial ecosystem of Cheongju. With its excellent views and convenient transportation, many companies are moving in and reborn with their own unique identities. Spanning 60,000 square meters—eight times the size of a soccer field—with a length of 339 meters and a width of 172 meters, and a height of 71 meters. The Cheongju Hynix M15 Project, housed in a majestic two-story cleanroom that embodies Hynix’s vision for the Fourth Industrial Revolution, will involve a phased investment of approximately 20 trillion won. This project is designed to proactively address future demand and serve as a forward base to lead the semiconductor market in the years to come.

Films