The Mapo Resource Recovery Facility (a municipal solid waste incineration plant) selected its designer and contractor through a turnkey (design-build) tender in 2001, began construction in 2001, and was completed in 2005.
This comprehensive environmental facility can incinerate 750 tons of municipal solid waste per day (250 tons per unit across three units), recycles materials such as road base and paving materials, and supplies thermal energy for residential heating to 20,000 households. In addition, an ecological park has been created to provide a recreational space for local residents and visitors.





-
Status
Completed
-
Order
Seoul City Construction and Safety Headquarters
-
Purpose
Public, Industrial, Office
-
Design Year
2001
-
Completion Year
2005
-
Location
Mapo-gu, Seoul
-
Site area
70,402.60m2
-
Gross Floor Area
29,177.58m2
-
Building Area
11,102.71m2
-
Scale
B1, 6F
The Mapo Resource Recovery Facility (a municipal solid waste incineration plant) selected its designer and contractor through a turnkey (design-build) tender in 2001, began construction in 2001, and was completed in 2005.
This comprehensive environmental facility can incinerate 750 tons of municipal solid waste per day (250 tons per unit across three units), recycles materials such as road base and paving materials, and supplies thermal energy for residential heating to 20,000 households. In addition, an ecological park has been created to provide a recreational space for local residents and visitors.