{"id":7916,"date":"1997-11-19T16:45:00","date_gmt":"1997-11-19T07:45:00","guid":{"rendered":"https:\/\/junglim.com\/?p=7916"},"modified":"2026-07-30T15:48:28","modified_gmt":"2026-07-30T06:48:28","slug":"skt-incheon-office","status":"publish","type":"post","link":"https:\/\/junglim.com\/en\/skt-incheon-office\/","title":{"rendered":"SK Telecom Incheon Central Office"},"content":{"rendered":"\n<div class=\"wp-block-group pjtText\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\">This project is SK Telecom\u2019s first dedicated switching center building. In the early stages of the project, significant time was invested in defining the concept of a dedicated switching center, resulting in a floor plan designed to serve as a prototype for standard switching centers by giving utmost consideration to equipment layout, operational workflows, and the working environment for staff.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The building\u2019s design also focused on expressing SK Telecom\u2019s new brand image, with the aim of creating facade elements that could serve as a standard for future switching centers.<\/p>\n<\/div><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"7918\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/11\/1997_SKT-Incheon-Office_slide_01.jpg\" alt=\"\" class=\"wp-image-7918\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"7919\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/11\/1997_SKT-Incheon-Office_slide_02.jpg\" alt=\"\" class=\"wp-image-7919\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project is SK Telecom\u2019s first dedicated switching center building. In the early stages of the project, significant time was invested in defining the concept of a dedicated switching center, resulting in a floor plan designed to serve as a prototype for standard switching centers by giving utmost consideration to equipment layout, operational workflows, and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":12927,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39,54,23,71,15,70,20,21,22],"tags":[],"class_list":["post-7916","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1990s","category-datacenter","category-incheon","category-office","category-projects","category-research","category-year","category-type","category-location"],"acf":[],"_links":{"self":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/7916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/comments?post=7916"}],"version-history":[{"count":0,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/7916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media\/12927"}],"wp:attachment":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media?parent=7916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/categories?post=7916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/tags?post=7916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}