{"id":1764,"date":"2018-11-08T15:54:00","date_gmt":"2018-11-08T06:54:00","guid":{"rendered":"http:\/\/junglim.com\/?p=1764"},"modified":"2025-11-06T19:47:34","modified_gmt":"2025-11-06T10:47:34","slug":"sk-hynix-icheon-m16","status":"publish","type":"post","link":"https:\/\/junglim.com\/en\/sk-hynix-icheon-m16\/","title":{"rendered":"SK Hynix M16 &amp; Annex, Icheon"},"content":{"rendered":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"853\" height=\"1280\" data-id=\"1766\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_01.jpg\" alt=\"\" class=\"wp-image-1766\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1769\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_02.jpg\" alt=\"\" class=\"wp-image-1769\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1767\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_03.jpg\" alt=\"\" class=\"wp-image-1767\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1771\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_04.jpg\" alt=\"\" class=\"wp-image-1771\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1770\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_05.jpg\" alt=\"\" class=\"wp-image-1770\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1768\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_06.jpg\" alt=\"\" class=\"wp-image-1768\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1772\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_07.jpg\" alt=\"\" class=\"wp-image-1772\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" data-id=\"1773\" src=\"https:\/\/junglim.com\/wp-content\/uploads\/2025\/04\/2018_sk-hynix-m16-annex_slide_08.jpg\" alt=\"\" class=\"wp-image-1773\"\/><\/figure>\n<\/figure>\n\n\n\n<div class=\"wp-block-group pjtText is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<p>The SK Hynix M16 is a project to construct the largest semiconductor (D-RAM) production building and auxiliary facilities in Korea on the site of a demolished existing line and idle land. Junglim Architecture was responsible for the architectural design of the main FAB building and auxiliary buildings, participating from the planning stage through to completion.<\/p>\n\n\n\n<p>The semiconductor line construction followed a typical fast-track approach, with BIM applied throughout the main FAB building&#8217;s design process. Developed as an expandable facility, the Icheon campus, now saturated, was given a campus concept, with design and site work focused on ensuring smooth utility (UT) flows between facilities.<\/p>\n\n\n\n<p>The lower floors of the FAB building house the next-generation production equipment called EUV (Extreme Ultraviolet), testing, and development lines, with upper and lower FABs combined to pioneer the world\u2019s first \u201c3-layer FAB.\u201d The core of the auxiliary buildings, the Central Utility Building (CUB), was planned to function as a hub facilitating the organic space arrangement of five different facilities and the smooth supply and return of utilities. Facade, interior, and landscaping designs emphasized a modern industrial park image to create a vibrant Icheon campus for Hynix staff and partner companies.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The SK Hynix M16 is a project to construct the largest semiconductor (D-RAM) production building and auxiliary facilities in Korea on the site of a demolished existing line and idle land. Junglim Architecture was responsible for the architectural design of the main FAB building and auxiliary buildings, participating from the planning stage through to completion. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1765,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,42,44,63,71,15,60,20,21,22,32],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/1764"}],"collection":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/comments?post=1764"}],"version-history":[{"count":0,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/1764\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media\/1765"}],"wp:attachment":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media?parent=1764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/categories?post=1764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/tags?post=1764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}