{"id":13671,"date":"2023-11-06T16:28:51","date_gmt":"2023-11-06T07:28:51","guid":{"rendered":"https:\/\/junglim.com\/?p=11766"},"modified":"2026-10-06T16:01:47","modified_gmt":"2026-10-06T07:01:47","slug":"sk-on-%ec%9d%b4%ec%b0%a8%ec%a0%84%ec%a7%80-%ec%84%9c%ec%82%b02%ea%b3%b5%ec%9e%a5-remodeling-%ec%84%a4%ea%b3%84-%ea%b2%bd%ec%9f%81%ec%9e%85%ec%b0%b0-%eb%8b%b9","status":"publish","type":"post","link":"https:\/\/junglim.com\/en\/sk-on-%ec%9d%b4%ec%b0%a8%ec%a0%84%ec%a7%80-%ec%84%9c%ec%82%b02%ea%b3%b5%ec%9e%a5-remodeling-%ec%84%a4%ea%b3%84-%ea%b2%bd%ec%9f%81%ec%9e%85%ec%b0%b0-%eb%8b%b9\/","title":{"rendered":"SK ON Wins Competitive Bid for the Remodeling Design of the Seosan Plant No. 2 for Rechargeable Batteries!!"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/junglim.com\/en\/wp-content\/uploads\/sites\/5\/2026\/07\/Gemini_Generated_Image_360kx9360kx9360k.jpg\" alt=\"\" class=\"wp-image-11768\" \/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">The image above is for illustrative purposes only.<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Location: Mujang Industrial Road, Jigok-myeon, Seosan-si, South Chungcheong Province<br>Site Area: 228,300.00 m\u00b2 (69,060 pyeong)<br>Building Area: 27,780.00 m\u00b2 (8,405 pyeong)<br>Total Floor Area: 61,500 m\u00b2 (18,600 pyeong) \/ Renovation Area: Approx. 21,700 m\u00b2 (6,560 pyeong)<br>Use: Industrial Facility (Batteries)<br>Scale: 4 stories above ground<br>Lead Departments: Hi-Tech Group + Development Planning Headquarters<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The image above is for illustrative purposes only. Location: Mujang Industrial Road, Jigok-myeon, Seosan-si, South Chungcheong ProvinceSite Area: 228,300.00 m\u00b2 (69,060 pyeong)Building Area: 27,780.00 m\u00b2 (8,405 pyeong)Total Floor Area: 61,500 m\u00b2 (18,600 pyeong) \/ Renovation Area: Approx. 21,700 m\u00b2 (6,560 pyeong)Use: Industrial Facility (Batteries)Scale: 4 stories above groundLead Departments: Hi-Tech Group + Development Planning Headquarters<\/p>\n","protected":false},"author":3,"featured_media":13677,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,2],"tags":[],"class_list":["post-13671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-awards","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/13671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/comments?post=13671"}],"version-history":[{"count":0,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/posts\/13671\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media\/13677"}],"wp:attachment":[{"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/media?parent=13671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/categories?post=13671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junglim.com\/en\/wp-json\/wp\/v2\/tags?post=13671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}