{"id":4645,"date":"2025-07-22T17:24:52","date_gmt":"2025-07-22T08:24:52","guid":{"rendered":"https:\/\/junglim.com\/cm\/?p=4645"},"modified":"2025-11-05T16:58:31","modified_gmt":"2025-11-05T07:58:31","slug":"korea-asset-management-corporation-gyeonggi-rh","status":"publish","type":"post","link":"https:\/\/junglim.com\/cm-en\/korea-asset-management-corporation-gyeonggi-rh\/","title":{"rendered":"Korea Asset Management Corporation \u2013 Gyeonggi Regional Headquarters"},"content":{"rendered":"\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"2371\" height=\"1692\" data-id=\"4650\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_1-1.jpg\" alt=\"\" class=\"wp-image-4650\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_1-1.jpg 2371w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_1-1-800x571.jpg 800w\" sizes=\"(max-width: 2371px) 100vw, 2371px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1620\" height=\"1282\" data-id=\"4648\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_2.jpg\" alt=\"\" class=\"wp-image-4648\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_2.jpg 1620w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_2-800x633.jpg 800w\" sizes=\"(max-width: 1620px) 100vw, 1620px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1786\" height=\"1787\" data-id=\"4649\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_3.jpg\" alt=\"\" class=\"wp-image-4649\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_3.jpg 1786w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/07\/Korea-Asset_3-800x800.jpg 800w\" sizes=\"(max-width: 1786px) 100vw, 1786px\" \/><\/figure>\n<\/figure>\n\n\n\n<div class=\"wp-block-group pjtText is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<div class=\"wp-block-group step is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<div class=\"wp-block-group step is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<h2 class=\"wp-block-heading\">Planning Phase<\/h2>\n\n\n\n<h2 class=\"wp-block-heading\">Design Phase<\/h2>\n\n\n\n<ul>\n<li>Design service management and performance review<\/li>\n\n\n\n<li>Management of design documentation and quality<\/li>\n\n\n\n<li>Design value engineering (VE) and constructability review<\/li>\n\n\n\n<li>Design safety review<\/li>\n\n\n\n<li>Analysis of environmental, traffic, and disaster impacts<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Purchase &amp; Procurement Phase<\/h2>\n\n\n\n<ul>\n<li>Bidding process support<\/li>\n\n\n\n<li>Contract management support<\/li>\n\n\n\n<li>Supplied material procurement support<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Phase<\/h2>\n\n\n\n<ul>\n<li>Review of construction commencement reports<\/li>\n\n\n\n<li>Review and management of temporary works plans<\/li>\n\n\n\n<li>Management of design changes and contracts<\/li>\n\n\n\n<li>Review of construction plans and construction details<\/li>\n\n\n\n<li>Material management (selection and inspection)<\/li>\n\n\n\n<li>Quality control<\/li>\n\n\n\n<li>Safety management<\/li>\n\n\n\n<li>Environmental management<\/li>\n\n\n\n<li>Technical review and training<\/li>\n\n\n\n<li>Progress inspection and pre-completion\/as-built inspection<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Post-Construction Phase<\/h2>\n\n\n\n<ul>\n<li>Facility maintenance<\/li>\n\n\n\n<li>Preparation and submission of the final report<\/li>\n\n\n\n<li>Evaluation of the construction management service<\/li>\n\n\n\n<li>Support for defect repair and rectification<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Planning Phase Design Phase Purchase &amp; Procurement Phase Construction Phase Post-Construction Phase<\/p>\n","protected":false},"author":1,"featured_media":4647,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,46,71,16,23,24,25],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts\/4645"}],"collection":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/comments?post=4645"}],"version-history":[{"count":0,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts\/4645\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/media\/4647"}],"wp:attachment":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/media?parent=4645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/categories?post=4645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/tags?post=4645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}