{"id":2997,"date":"2025-05-02T10:00:00","date_gmt":"2025-05-02T01:00:00","guid":{"rendered":"http:\/\/junglim.com\/cm\/?p=2997"},"modified":"2025-11-13T17:07:05","modified_gmt":"2025-11-13T08:07:05","slug":"high-tech-indutrial-infrastructure","status":"publish","type":"post","link":"https:\/\/junglim.com\/cm-en\/high-tech-indutrial-infrastructure\/","title":{"rendered":"High-tech Indutrial &amp; Infrastructure"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Junglim CM builds the industry\u2019s heart and designs the clients\u2019 future together.<\/h2>\n\n\n\n<p>Both advanced industrial facilities (for biotech, pharmaceuticals, advanced materials, semiconductors, chemicals, and more) and infrastructure facilities (such as roads, ports, aerospace, broadcasting and telecommunication stations, green and environmental spaces) require complex and evolving processes. Junglim CM realizes these complex concepts in reality, supporting the delivery of large-scale projects and convergent programs within scheduled timelines and budgets.<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-large-font-size\">Capital Programs and Industrial Manufacturing<\/h2>\n\n\n\n<p class=\"has-medium-font-size\">The most important aspect of construction management for advanced industrial and infrastructure facilities is controlling data through regular, real-time monitoring and performing consistent project management with systematic oversight. Additionally, Junglim CM provides tailored solutions that match the unique nature of each industrial project rather than offering uniform services.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"842\" height=\"596\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/scope.png\" alt=\"\" class=\"wp-image-3424\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/scope.png 842w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/scope-800x566.png 800w\" sizes=\"(max-width: 842px) 100vw, 842px\" \/><\/figure><\/div>\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">A Broad Spectrum of Services<\/h2>\n\n\n\n<p>Based on Junglim CM\u2019s accumulated know-how and construction management experience, we anticipate and proactively respond to challenges our clients may face. Our unique Total Project Management Solution ensures that projects meet clients\u2019 specific needs and requirements while completing on time and within the established budget.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-10 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:17%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-columns uldot is-layout-flex wp-container-7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-style-default\"><img decoding=\"async\" loading=\"lazy\" width=\"1080\" height=\"1080\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/005-2.png\" alt=\"\" class=\"wp-image-3165\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/005-2.png 1080w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/005-2-800x800.png 800w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<h5 class=\"wp-block-heading\">Planning and Engineering<\/h5>\n\n\n\n<ul class=\"has-small-font-size\">\n<li>Feasibility study and site evaluation<\/li>\n\n\n\n<li>Procurement and contract strategy establishment<\/li>\n\n\n\n<li>Project budget planning and verification<\/li>\n\n\n\n<li>Process design evaluation<\/li>\n\n\n\n<li>Facility condition inspection<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1080\" height=\"1080\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/004-1.png\" alt=\"\" class=\"wp-image-3166\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/004-1.png 1080w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/004-1-800x800.png 800w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<h5 class=\"wp-block-heading\">PM &amp; CM Services<\/h5>\n\n\n\n<ul class=\"has-small-font-size\">\n<li>Construction Management (CM)<\/li>\n\n\n\n<li>Program and Project Management (PM)<\/li>\n\n\n\n<li>Design Data Management<\/li>\n\n\n\n<li>Procurement and Contract Management<\/li>\n\n\n\n<li>HSE (Health, Safety, Environment) Management<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1080\" height=\"1080\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/003-1.png\" alt=\"\" class=\"wp-image-3167\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/003-1.png 1080w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/003-1-800x800.png 800w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<h5 class=\"wp-block-heading\">Safety<\/h5>\n\n\n\n<ul class=\"has-small-font-size\">\n<li>Review of safety management plans<\/li>\n\n\n\n<li>Hazard prevention (Material Safety Data Sheet) planning<\/li>\n\n\n\n<li>Safety management and inspections<\/li>\n\n\n\n<li>Early action on proactive risk assessments<\/li>\n\n\n\n<li>Achieving zero major accidents and accident-free operations<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1080\" height=\"1080\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/001-1.png\" alt=\"\" class=\"wp-image-3168\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/001-1.png 1080w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/001-1-800x800.png 800w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<h5 class=\"wp-block-heading\">Environment<\/h5>\n\n\n\n<ul class=\"has-small-font-size\">\n<li>Compliance with permits and legal requirements<\/li>\n\n\n\n<li>Support for energy management services<\/li>\n\n\n\n<li>Preparation of construction waste management systems<\/li>\n\n\n\n<li>Establishment of eco-friendly certification strategies<\/li>\n\n\n\n<li>Launch of the ESG manageement system across all business sites<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1080\" height=\"1080\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/002-1.png\" alt=\"\" class=\"wp-image-3170\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/002-1.png 1080w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/002-1-800x800.png 800w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<h5 class=\"wp-block-heading\">IT Technology<\/h5>\n\n\n\n<ul class=\"has-small-font-size\">\n<li>Integrated Document Management System (IDMS)<\/li>\n\n\n\n<li>Compliance with Data Governance<\/li>\n\n\n\n<li>Data protection and dual backup<\/li>\n\n\n\n<li>BIM-Cloud collaboration system<\/li>\n\n\n\n<li>PMIS (Project Management Information System) implementation<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:17%\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">The Point of High-tech &amp; Infrastructure<\/h2>\n\n\n\n<p>With the normalization of AI usage, global demand for data centers to maintain smooth computing capacity and server resources is rapidly increasing. Junglim CM possesses extensive experience and expertise in some of the industry\u2019s most advanced facilities and financial sector data centers, including Gasan Metro Data Center, Shinhan Financial Data Center, Sihwa National Industrial Complex Data Center in Ansan, and the Export-Import Bank of Korea Data Center. We ensure the success of our clients\u2019 businesses in a data-centric world built on precision and stability.<\/p>\n\n\n\n<div class=\"wp-block-cover\" style=\"min-height:220px\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim\"><\/span><img decoding=\"async\" loading=\"lazy\" width=\"853\" height=\"1280\" class=\"wp-block-cover__image-background wp-image-2436\" alt=\"\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_nongshim-dc-incheon_slide-04.jpg\" style=\"object-position:47% 74%\" data-object-fit=\"cover\" data-object-position=\"47% 74%\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_nongshim-dc-incheon_slide-04.jpg 853w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_nongshim-dc-incheon_slide-04-800x1200.jpg 800w\" sizes=\"(max-width: 853px) 100vw, 853px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-13 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h2 class=\"wp-block-heading has-white-color has-text-color has-x-large-font-size\">High-tech Indutrial<\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<p class=\"has-text-align-left has-white-background-color has-text-color has-background has-small-font-size\" style=\"color:#000000d1\"><strong>The More Complex the Project, the More It is Completed with Flexible Strategies.<br><\/strong>From the project&#8217;s outset, we define the client\u2019s requirements to minimize unforeseen situations during engineering and design phases while planning and executing the project. This proactive process reduces rework in the later stages, promotes smooth collaboration on site, and supports handover and transition from design to construction. We continuously cooperate with clients to deliver engineering packages that are appropriate and efficient for the project\u2019s goals.<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-cover\" style=\"min-height:220px\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim\"><\/span><img decoding=\"async\" loading=\"lazy\" width=\"2048\" height=\"2588\" class=\"wp-block-cover__image-background wp-image-545\" alt=\"\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/02\/2001_incheon-international-airport-passenger-terminal_005.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/02\/2001_incheon-international-airport-passenger-terminal_005.jpg 2048w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/02\/2001_incheon-international-airport-passenger-terminal_005-800x1011.jpg 800w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-17 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:50%\">\n<h2 class=\"wp-block-heading has-white-color has-text-color has-x-large-font-size\">Infrastructure<\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<p class=\"has-text-align-left has-white-background-color has-text-color has-background has-small-font-size\" style=\"color:#000000d1\"><strong>We Connect People and Opportunities, Nature and Cities, Enterprises and Capital.<\/strong><br>Junglim CM has planned, built, and operated major domestic and international infrastructure projects with our clients. Beyond constructing basic facilities such as roads, bridges, tunnels, ports, airports, and waterways, we have striven to unlock regional potential, enhance energy efficiency, and create safer societies. We set diverse goals to respond to rapid urban growth, revitalize aging infrastructure, rebuild communities, and establish extensive networks, successfully fulfilling our mission.<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-large-font-size\">Integrated Database Management System<\/h2>\n\n\n\n<p>With the adoption of Junglim CM\u2019s IDMS solution, all data can be managed in an integrated manner, preventing data omission and duplication and dramatically improving work efficiency. Additionally, its role-based security management and version history tracking simplify audit responses, while real-time sharing and monitoring facilitate smooth collaboration between headquarters and field sites. For every project with Junglim CM, data is managed with high quality and reliability.<\/p>\n\n\n\n<p>Our solution addresses the limitations of the traditionally site-based PMIS (Project Management Information System) \u2014 which requires the simultaneous management of multiple separate project progressions \u2014 by visualizing and monitoring data for all projects managed collaboratively with our clients. This prevents data silos caused by redundant work, inefficient decision-making, and inconsistent data. Through client-focused project management, Junglim CM improves the delivery of CM and PM services to manage complex projects more effectively.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"1349\" height=\"600\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/08\/DATA-PIPLINE.jpeg\" alt=\"\" class=\"wp-image-4791\" style=\"aspect-ratio:3.7642487046632125;object-fit:contain;width:1200px\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/08\/DATA-PIPLINE.jpeg 1349w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/08\/DATA-PIPLINE-800x356.jpeg 800w\" sizes=\"(max-width: 1349px) 100vw, 1349px\" \/><\/figure><\/div>\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">What is the difference JUNGLIM CM&#8217;s IDMS ?<\/h2>\n\n\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"background-color:#f0f0f0\"><div class=\"wp-block-group__inner-container\">\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-22 wp-block-columns-is-layout-flex\" style=\"background-color:#f0f0f0\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:70%\">\n<div class=\"wp-block-media-text is-stacked-on-mobile is-image-fill\" style=\"grid-template-columns:35% auto\"><figure class=\"wp-block-media-text__media\" style=\"background-image:url(https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/data-governance-800x600.jpg);background-position:50% 50%\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"600\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/data-governance-800x600.jpg\" alt=\"\" class=\"wp-image-3426 size-thumbnail\"\/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong>Data Governance Process<\/strong><br>Data Governance is a system of policies and procedures designed to manage and control the quality, security, use, and accountability of data within an organization. Through Junglim CM\u2019s thorough data governance, data-driven decision-making is strengthened, duplicate data is eliminated, and data risks (such as leakage and misuse) are minimized, thereby ensuring reliable data assets for our clients.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"background-color:#f0f0f0\"><div class=\"wp-block-group__inner-container\">\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-27 wp-block-columns-is-layout-flex\" style=\"background-color:#f0f0f0\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:70%\">\n<div class=\"wp-block-media-text is-stacked-on-mobile is-image-fill\" style=\"grid-template-columns:35% auto\"><figure class=\"wp-block-media-text__media\" style=\"background-image:url(https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/monitoring.jpg);background-position:50% 50%\"><img decoding=\"async\" loading=\"lazy\" width=\"3260\" height=\"1899\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/monitoring.jpg\" alt=\"\" class=\"wp-image-3427 size-full\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/monitoring.jpg 3260w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/monitoring-800x466.jpg 800w\" sizes=\"(max-width: 3260px) 100vw, 3260px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong>Integrated Document Monitoring Dashboard<\/strong><br>Junglim CM manages all project data on a cloud-based integrated platform. Through the online Integrated Document Management System (IDMS), stable transfer and real-time monitoring of site data are conducted, providing dashboards that visualize data status, transfer progress, and project-specific data analyses. By systematizing the flow of valuable client data, this platform optimizes project efficiency and data protection.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"background-color:#f0f0f0\"><div class=\"wp-block-group__inner-container\">\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-32 wp-block-columns-is-layout-flex\" style=\"background-color:#f0f0f0\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:70%\">\n<div class=\"wp-block-media-text is-stacked-on-mobile is-image-fill\" style=\"grid-template-columns:35% auto\"><figure class=\"wp-block-media-text__media\" style=\"background-image:url(https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/security-800x533.jpg);background-position:50% 50%\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"533\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/security-800x533.jpg\" alt=\"\" class=\"wp-image-3429 size-thumbnail\"\/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong>Robust Data Security Solutions<\/strong><br>Junglim CM systematically manages project data and applies a cloud system across all sites, enabling real-time monitoring and storage through its data control center. In addition, all data is redundantly backed up on internal servers, ensuring a secure and reliable data protection system under any circumstance.<\/p>\n<\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:15%\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group ourpjt is-layout-constrained wp-block-group-is-layout-constrained\"><div class=\"wp-block-group__inner-container\">\n<h2 class=\"wp-block-heading\">Our Projects<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-40 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-columns is-layout-flex wp-container-35 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/05\/indiana_stla_ai.png\" alt=\"\" class=\"wp-image-3213\" style=\"aspect-ratio:4\/3;object-fit:cover\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/indiana_stla_ai.png 1024w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/05\/indiana_stla_ai-800x800.png 800w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Indiana STLA JV Plant 1<\/h4>\n\n\n\n<p>This facility is currently under construction in Indiana to expand electric vehicle production capacity, aiming to meet the anticipated increased demand for electric vehicles in North America in the near future.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"800\" height=\"451\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/07\/\uc6a9\uc778_data_center.png\" alt=\"\" class=\"wp-image-4069\" style=\"aspect-ratio:4\/3;object-fit:cover\"\/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">The Export-Import Bank of Korea Data Center<\/h4>\n\n\n\n<p>Adopting a cloud-based design and artificial intelligence monitoring system, the data center leads digital transformation in financial services, enhancing corporate financing platforms and enabling automated credit evaluations.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"2480\" height=\"2480\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2024\/10\/2022_songdo-satoriuse-CG_000.jpg\" alt=\"\" class=\"wp-image-957\" style=\"aspect-ratio:4\/3;object-fit:cover\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2024\/10\/2022_songdo-satoriuse-CG_000.jpg 2480w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2024\/10\/2022_songdo-satoriuse-CG_000-800x800.jpg 800w\" sizes=\"(max-width: 2480px) 100vw, 2480px\" \/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Sartorius Research Center, Songdo<\/h4>\n\n\n\n<p>Operated by the German global bio-company Sartorius, this facility is to produce raw and subsidiary materials and conduct research, significantly enhancing the stability and self-reliance of the domestic bio-industry supply chain.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"1920\" height=\"1280\" src=\"https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_sk-broadband-idc-gasan-ctr_slide_05.jpg\" alt=\"\" class=\"wp-image-1707\" style=\"aspect-ratio:1.3333333333333333;object-fit:cover\" srcset=\"https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_sk-broadband-idc-gasan-ctr_slide_05.jpg 1920w, https:\/\/junglim.com\/cm-en\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_sk-broadband-idc-gasan-ctr_slide_05-800x533.jpg 800w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Gasan Data Center<\/h4>\n\n\n\n<p>As a core digital infrastructure hub within Seoul, the Gasan Data Center is poised to play an essential role in meeting the growing demand from domestic and international cloud and IT companies.<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-cover is-repeated ask wp-duotone-000000-ffffff-43\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-10 has-background-dim\"><\/span><div role=\"img\" class=\"wp-block-cover__image-background wp-image-1783 is-repeated\" style=\"background-position:50% 50%;background-image:url(https:\/\/junglim.com\/cm\/wp-content\/uploads\/sites\/6\/2025\/04\/2018_busan-north-port-marina_slide_08.jpg)\"><\/div><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<h2 class=\"wp-block-heading has-text-align-left\">Junglim CM is ready to build the industry\u2019s heart and design the future together with you.<\/h2>\n\n\n\n<div class=\"wp-block-buttons is-horizontal is-content-justification-center is-layout-flex wp-container-42 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-25 is-style-fill\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/junglim.com\/cm-en\/contact\/\" style=\"border-radius:0px\">Inquiry<\/a><\/div>\n<\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>We lead innovation in advanced and infrastructure industries, collaboratively designing the future with our clients.<\/p>\n","protected":false},"author":1,"featured_media":3141,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts\/2997"}],"collection":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/comments?post=2997"}],"version-history":[{"count":0,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/posts\/2997\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/media\/3141"}],"wp:attachment":[{"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/media?parent=2997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/categories?post=2997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junglim.com\/cm-en\/wp-json\/wp\/v2\/tags?post=2997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}