Planning Phase
Design Phase
Purchase & Procurement Phase
Construction Phase
- Review of construction commencement reports
- Review and management of temporary works plans
- Management of design changes and contracts
- Review of construction plans and construction details
- Material management (selection and inspection)
- Quality control
- Safety management
- Environmental management
- Technical review and training
- Progress inspection and pre-completion/as-built inspection
Post-Construction Phase
The SK Broadband IDC Gasan was established in response to the rapidly-growing demand in the domestic cloud market, following its previous data centers in Seocho, Ilsan, and Bundang. Unlike most domestic data centers used exclusively by the owning company, the Gasan data center primarily serves as a leasing facility aimed at attracting global operators.
The design includes ample dock space capable of accommodating large vehicles such as container trailers. The first and second floors house support facilities such as meeting rooms and lounges, while server rooms occupy floors three through ten. The center has a total power capacity of 80MW, IT load of 46MW, and approximately 8,000 server racks. It is certified as a Tier III data center and features seismic design to withstand earthquakes up to magnitude 7.0, ensuring stable data preservation. The façade design features thin, layered elements emphasizing verticality and segmentation, which reduces the visual bulkiness typically associated with large data center structures.
-
Client
Gielgasan Metro
-
Program
Industrial
-
Location
Geumcheon-gu, Seoul
-
Period
2018 - 2021
-
Completion Year
2021
-
Design
JUNGLIM Architecture
-
Supervision
JUNGLIM CM Architecture
-
Site area
8,247.00m2
-
Building Area
4,938.70m2
-
Gross Floor Area
69,088.65m2
-
Number of Level
B5, 10F







Planning Phase
Design Phase
Purchase & Procurement Phase
Construction Phase
- Review of construction commencement reports
- Review and management of temporary works plans
- Management of design changes and contracts
- Review of construction plans and construction details
- Material management (selection and inspection)
- Quality control
- Safety management
- Environmental management
- Technical review and training
- Progress inspection and pre-completion/as-built inspection
Post-Construction Phase
The SK Broadband IDC Gasan was established in response to the rapidly-growing demand in the domestic cloud market, following its previous data centers in Seocho, Ilsan, and Bundang. Unlike most domestic data centers used exclusively by the owning company, the Gasan data center primarily serves as a leasing facility aimed at attracting global operators.
The design includes ample dock space capable of accommodating large vehicles such as container trailers. The first and second floors house support facilities such as meeting rooms and lounges, while server rooms occupy floors three through ten. The center has a total power capacity of 80MW, IT load of 46MW, and approximately 8,000 server racks. It is certified as a Tier III data center and features seismic design to withstand earthquakes up to magnitude 7.0, ensuring stable data preservation. The façade design features thin, layered elements emphasizing verticality and segmentation, which reduces the visual bulkiness typically associated with large data center structures.